Planning permits are won early — in the site analysis, the design response and the conversations with council. Our drawings carry the weight of three decades of getting projects across the line.

Town planning that anticipates what council will ask

Town planning is rarely about the drawings alone. It's about understanding the planning controls that apply to your site — zones, overlays, ResCode, neighbourhood character provisions — and shaping the design response so that the application has the best chance of approval.

We've worked across most of Victoria's planning schemes. We know which councils are tough on overshadowing, which fixate on car parking, which want a clear neighbourhood character argument. That knowledge informs the design before the first sketch.

Town planning drawings Melbourne — BuiltIN Studio

What's in our planning permit drawings

  • Site & context plan — surrounding streetscape, neighbouring properties, existing vegetation, levels.
  • Existing & demolition plans where applicable.
  • Floor plans, elevations and sections showing the proposed development.
  • Shadow diagrams for equinox compliance and neighbour amenity.
  • Materials & finishes schedule with photographic references.
  • Landscape plan coordination with landscape consultants.
  • Coverage, site density and ResCode metrics as required.

Consultant coordination

Most planning applications need more than drawings. We coordinate the supporting consultants you'll need — land surveyors for feature surveys, arborists for tree assessments, traffic engineers, waste management consultants, sustainability advisors. One point of contact, one schedule, one set of consistent assumptions across all documents.

Through the process

Pre-application meetings, RFIs, neighbour notification, VCAT support if needed — we stay in the application from lodgement to permit. Start the conversation →

Council by council

Every municipality reads its scheme differently.

The overlays, character controls and local policies that decide your permit are set at council level — not state level. These are the councils we have built in.

We run the application, not just the drawings

There is a difference between preparing a planning set and managing a planning application, and it is where most projects lose months. The drawings are the artefact. The application is a process — with a statutory clock, a council officer, sometimes objectors, and a series of moments where a fast, well-judged response is worth more than a beautiful elevation.

This page is about that process. If you want to know what actually goes into a planning set — the shadow diagrams, the ResCode response, the materials schedule — that is covered in detail on town planning drawings.

The request for further information is the whole game

Most planning delays are not design disputes. They are RFIs. Council receives your application, finds it cannot assess what was submitted, writes to you asking for more — and the statutory clock stops until you answer. A fortnight of drift here, a month there, and a "three month" application is eight.

Two things prevent it. First, lodging complete: the survey, the shadow diagrams, the overlay-triggered reports, the standard-by-standard ResCode response. Second, when an RFI does land, answering it properly and quickly rather than negotiating it in instalments.

The pre-application meeting is the cheapest hour in the process. Several councils offer it free. Finding out what an officer thinks before you lodge is worth more than finding out after — and it is one of the few points where the relationship, rather than the paperwork, does the work.

What we actually do

  • Establish the controls first — zone, overlays, character precinct — before design, not after. This is the step that changes projects.
  • Test the built form against the standards that apply to your precinct, so the scheme that gets drawn is the scheme that can be approved.
  • Assemble the submission — and coordinate the consultants an overlay drags in: bushfire, heritage, arborist, traffic.
  • Lodge and manage it — officer liaison, RFI responses, amended plans, and the negotiation that decides marginal applications.
  • Handle advertising and objections where a proposal is advertised — overlooking, overshadowing and neighbourhood character are the three grounds that carry weight.
  • Carry it to VCAT if it comes to that, though our preference is a proposal defensible enough that it does not.

Every council reads its scheme differently

This is the part outsiders underestimate. The state sets the framework; the municipality sets the overlays, the character precincts and the local policy — and the officer applies them. We have built in these councils and written up what each one actually asks for:

Frankston · Monash · Whitehorse · Glen Eira · Kingston · Boroondara · Darebin · Banyule

Once planning is resolved, the endorsed drawings become the basis of the building permit — a separate approval, different assessor, different rulebook.